how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / aamir shahzad
ratio is 1:2:4 sum is equle 7
1 bag cement is equle to 1.25
total quantity resum is 200 cft
dry Volume of total quantity which is 200 cft to multiply
1.54 will be the value of total quantity is 308 cft.
which is the total quantity 308 multiply 1(which is cement
ratio)and divided 7 which is the sum of ratio it will
become 44 and now we convert cft to cement bag which is the
value of 1.25 for bag.
44 divided by 1.25 is 35.2 the Sum is 35.2 Cement of Bags.
same for sand. which value was came after dry
308 multiply ratio of sand which is 2 then divided sum of
the ratio which is 7 will become the value of Sand is=88 cft
for crash 308 multiply 4 which is the value of crush and
devided by sum of value which is 7 total sum will become
176 cft.
Total sum of quantity of 1:2:4 mean.
Cement=35.2 Bags
Sand= 88 cft
Crush= 176 cft
These are right answer.
Is This Answer Correct ? | 48 Yes | 17 No |
Post New Answer View All Answers
what's the formula for calculate pcc for matt(45mm aggregate)?
What is 1/8 on the architect ruler denotes?
cause of cylinder test failure
how to convert sand in Cft to Kgs
satart to end steps by step process of building construction...? i want to planning theme accuretly
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
in the earthquqke the profile of water on dam is parabolic or not
Which are the top apps for you civil engineer?
what is E
What are the alternate material for steel, Sand and aggregate
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Explain moment of inertia?
Slump Values for works?