how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / pandian.a
cement = spgr/1+2+4=1.56/7=0.22cum sp gr of 20 mm=1.56c
0.22*1440=317 kg
317/50=6.5 bags wt of cement =1440kg/cum
sand=0.22*2=0.44cum
coarse
aggregate=.22*4=0.88cum
so cement=605 bags
sand=0.44 cum (15.52cft)
corse aggregate=0.88cum (31.04cft)
w/c ratio=12.5litre/bags
Is This Answer Correct ? | 13 Yes | 7 No |
Post New Answer View All Answers
Draw the cross section of a boundary wall and label its part with detailing?
What are the advantages and disadvantages of using plastic and timber fenders?
how much cement sand n bricks required in im3?and how much in plaster?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
rate analysis for cement pointing 1:4 , for 100 sq m
How cracks in concrete can be avoided?
What is the different type of slump test indications?
Explain moment of inertia?
what is the criteria for the finalisation of pavement thickness in road project?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
How to calculate laplength for 3 floors
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,