Can we use all 3 cores of a cable to connect DC motor + ve
terminal and similarly one more cable for - ve terminal.

Answers were Sorted based on User's Feedback



Can we use all 3 cores of a cable to connect DC motor + ve terminal and similarly one more cable f..

Answer / subhashree

yes

Is This Answer Correct ?    3 Yes 2 No

Can we use all 3 cores of a cable to connect DC motor + ve terminal and similarly one more cable f..

Answer / ashish jani

do not use like 3 core cable due to dc supply only +v & -v

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

WHAT IS THE difference betwwen LT CABLE AND CONTROL CABLE

5 Answers  


meaning of two lines in between the transformer single line diagram??

3 Answers  


In case of salient pole alternator when number of poles are 4 or more than 4 it helps the flux wave to be sinusoid as air gap length is increased from center to tip , but if the number of poles are 2 how does the flux wave is sinusoidal?

0 Answers  


What is the better way of passing 400 amp from sending end to receiving end ? By overhead line or underground cable and why ? if underground cable then how much depth require ?

1 Answers   Aditya Birla, HCL,


What is ideal IR values for ground and neutral.

0 Answers   Hindustan Power Projects,






what type of loads are inductive load & resistive load ?how they different between each other ?

5 Answers  


what happens when ac supply is given to the dc motor and dc supply is given to the ac motor?

1 Answers   GATE,


why we not connect the 12 V batteries in parallel to get the more backup supply for an UPS ? wheter off line or on line UPS ?

2 Answers  


what should be 3phase motor capacity or rating to connect in star connection. what should be 3phase motor capacity or rating to connect in delta connection. what should be 3phase motor capacity or rating to connect in star delta connection

1 Answers  


plz send me the procedure and syllabus for mseb exam

0 Answers  


how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?

0 Answers   Schneider,


what are the problems are there if power factor is leading

3 Answers   NTPC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)