Answer / maheswaran
Calculation of Materials:-
For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3
Wall plastering in CM 1:4 of 12 mm thick for 100 m2:-
Volume = 100 x (12/1000) = 1.20 m3
Add 30 to 35% as bulking of sand = 0.36 m3
Add 20 as wastage of sand = 0.312 m3
Total = 1.872 m3
= (1.872/1+4) = 0.374 m3
Cement = 0.374 x 30 = 10.77 bags
Sand = 0.374 x 4 =
1.496 m3
| Is This Answer Correct ? | 71 Yes | 11 No |
Answer / karthi
For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3
Volume = 100 x (12/1000) = 1.20 m3
Add 30 to 35% as bulking of sand = 0.36 m3
Add 20 as wastage of sand = 0.312 m3
Total = 1.872 m3
= (1.872/1+4) = 0.374 m3
Cement = 0.374 x 30 = 10.77 bags
Sand = 0.374 x 4 =
1.496 m3
| Is This Answer Correct ? | 22 Yes | 4 No |
Answer / sunee.p
Calculation of Materials:-
For 1 cum of concrete Mix 1:2:4 (M15)
1 cum concrete volume = 1.57 cum
= (1/7)*1.57 = 0.224 cum
For 1 cum = 30 bags of cement required (1440/50) say 29 bags
Cement = 0.224 x 29 = 6.496 bags
Sand = 0.224 x 2 = 0.448 cum
Aggregate = 0.224 x 4 = 0.896 cum
Wall plastering in CM 1:4 of 12 mm thick for 100 m2:-
Volume = 100 x (12/1000) = 1.20 cum
Add 30 as bulking of sand = 0.36 cum
Add 20 as wastage of sand = 0.312 cum
Total = 1.872 cum
= (1.872/1+4) = 0.374 cum
Cement = 0.374 x 3 = 10.77 bags
Sand = 0.374 x 4 = 1.496 cum
| Is This Answer Correct ? | 9 Yes | 3 No |
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
hai,i completed my b.tech civil.Recently i wrote the appsc exam for managers water supply engg.I want answers for general studies and civil engg paper2.If any body know or written that exam send to my mail id is ruksana.sk08@gmail.com.
How will you determine the capacity of a reservoir with help of contur
how much quantity of cement bags are required to fill the one m3 of empty container.?
what is the difference between prime coat and tack coat in road construction
Which standard describes the tolerance limit for undulation of RCC wall/ after POP surface?
how much water you will add to the mix, for making 1 m3 of concrete to achieve strength of mix 20N/mm2 at 28 days.
what is the ratio of steel and concrete to use in slabs , beams, columns ?
WHY THE WIDITH OF COLUMN IS TAKEN FOR DESIGN OF ISOLATED FOOTING??
how much quantity of paint is required for 1 square meter wall for single and double coat..?
for plaster what is the suitable sand.
What is the density of Cement, Fly ash,20 mm aggregate, 10 mm aggregate and stone dust?
14 Answers Amrapali, Egis, Himuda, Indramas, L&T,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)