For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3
Volume = 100 x (12/1000) = 1.20 m3
Add 30 to 35% as bulking of sand = 0.36 m3
Add 20 as wastage of sand = 0.312 m3
Total = 1.872 m3
= (1.872/1+4) = 0.374 m3
Cement = 0.374 x 30 = 10.77 bags
Sand = 0.374 x 4 =
1.496 m3
| Is This Answer Correct ? | 22 Yes | 4 No |
Post New Answer View All Answers
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
how i can tak Quantity of mortar in block work
to draw bm diagrams for portal frames under different loadings//
Why the statue of liberty is made of copper?
how gradation of aggregates effect on slump of fresh concrete?
how much shouid be the rate for ready mix concrete per cubic meter
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
In jack arch floor, the rise is kept?
What is Joule Brayton Cycle?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
what is constat for brickwork
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
The concrete slump recommended for beams and slabs; is?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.