Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate amount of materials for concreting and
plastering?

Answer Posted / karthi

For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3

Volume = 100 x (12/1000) = 1.20 m3
Add 30 to 35% as bulking of sand = 0.36 m3
Add 20 as wastage of sand = 0.312 m3
Total = 1.872 m3
= (1.872/1+4) = 0.374 m3
Cement = 0.374 x 30 = 10.77 bags
Sand = 0.374 x 4 =
1.496 m3

Is This Answer Correct ?    22 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

hi guys what happens if you are absent for a supplymentry exam?

1842


What is the per cu. mt. price of ready mix in Gujarat region.?

2366


What will be weight of 0.5mm GI sheet per sq.ft?

17590


What are the steps involved in the concreting process?

1354


What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code

2347


how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab

2444


What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

2195


What is an ice dam sock?

1145


if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?

2825


I need to constructive work in amaraj batteries

1868


all technical question

2280


punj loyed and sapurjl palanjl

2380


I what know about life time of frp tank plz explain about it specifications & other details

2284


For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.

2055


How many types of slabs are there & how to design it?

1305