Answer / santosh kawade
Rotar earth fault protection for generator (hydro or
thermal same scheme):
Rotar earth fault protection contains two stages 1st stage
earth fault protection and 2nd stage earth fault
protection.
As per scheme in normal running condition rotar core is
connected to rotar winding through a resistance bridge, as
soon as 1st stage rotar earth fault occur it gives alarm.
Then for 2nd stage rotar core is connected to ground
through a bridge and when 2nd stage rotar earth fault occur
it gives trip command to generator.
(Rotar connection to ground/winding is through a slip-ring
and brush system connected at one end of rotar.)
Santosh Kawade
9224 69 3116
| Is This Answer Correct ? | 14 Yes | 3 No |
Answer / siva
dc field flashing:to build up a voltage in a generator
residual flux is necessary. it is from the property of
retentivity of magnet. if it is absent we have to provide
the flux by a low voltage battery.this phenomena of
providing field flux(residual flux)by an external battery is
field flashing especially in dc shunt generator
| Is This Answer Correct ? | 9 Yes | 3 No |
What is the minimum underground tank size capacity considered for firefighting purpose?
What is the rating of your substation and what are the different types of substations?
what is the difference between 3 phase 3wire &3phase 4 wire meter?what is the advantage of 3p3w over 3p4w?
what is resistance
How to calculate 5hp 415v 3phase 2800rpm Ac motor full load current with out tourgh
what is a core company? why should we join a core company?
Is pure capacitor load and pure inductor load is an linear load? pls justify
In Designing the rating & accessories of a MCCB how to choose the type of releases..means what is the basis for selecting, thermal magnetic, electromagnetic & microprocessr based releases
What is Vk and Imag i.e Knee point voltage & Magnetising Current? How to calculate above values? How to define accuracy class 5P10?
7 Answers Deccan Cements, Doosan, Torrent Power, Transco,
critical losses of transformer
We have 750KVA DG set, we want to introduce REF relay with 1250/1A,CL PS,Current transformers.The lead distance of 2.5mm copper flexible cable from CT to relay is around 5mtrs.We would like to know the knee point votage(VK) & IM calculion for CT's
how to reverse the direction of universal motor?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)