how to prepare PPM schudule
Answers were Sorted based on User's Feedback
Answer / surender saini
PPM Schedule is prepared according to the activity code of the equipments
Because ppm is done on daily monthly & Quartley basis
Is This Answer Correct ? | 0 Yes | 0 No |
PPM means
preplanning
maintenance work..
Anyone work
starting, before you
will prepare the
planning..
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / mohammad farman khan-abu dhabi
PPM Schedule prepare by project portfolio management and
check length of schedule of project.
Is This Answer Correct ? | 0 Yes | 5 No |
Difference between ups
32 Answers Emerson, Tata Power,
what are the points to be consider for MCB(miniature circuit breaker selection?
If i have two 3000 kW motors and the whole facility requires a 10 MVA transformer. What would be better installing two 5 MVA transformers(one for 1 motor ) or just a single 10 MVA transformer for both of them. Give reasons for your answer.
why in 3.5 core means 3 core for phase and .5 for neutral?
what will be the energy loss =? Voltage drop = ? Conductor resistance at 20 degree C = ? Temprature convertion Factor at 50 degree c = ? on ACSR DOG Condutor at following data. distance = 4.8 kM Load = 2980 kWh Size of Conductor = 6/ 0.186 Volt = 11 kV.
1 Answers Pakistan Atomic Energy Commission PAEC,
Why the arms of delta in a delta-wye power transmission system are kept constant??
why transmission is done in delta system
If we need 4c× 50mm sq cable but it's not available so we can pull 4c×25mm sq two cables?
how to calculate energy of 3-phase motor?
what is meant by tranformer impedance?
What are the advantages and disadvantages of closed-loop control system?
If anyone would like to know or practice for FEWA papers contact me on mohamedrashad2@hotmail.com Just completed the supervisor exam in April 2021