if installing the transformer why put the sprit the stone ?
Answer / akshatha n a
to absorb the moisture content present in transformer oil
| Is This Answer Correct ? | 2 Yes | 2 No |
What is the technical formula to calculate the load taken by a motor in Amperes ?
In PT the coil is wound on?
why power generate in 33 kv it will be step down by 11 kv .
What is a variable speed motor?
what is V0/V rating of cable
How check electrical motor winding.
explain with diagram how to protect transformers and substations from over current with help of CT's?
What the main causes of transient interruptions on Over-Head Distribution Lines?
Why capacitor bank ratting Kvar?
what are the functions & ratings of panels mentioned below: 1. Main LT Panel(MLTP) 2. Motor Control Centre(MCC) 3.Feeder pillars 4.Busducts
How to take the Vector Group Test in Transformer? What is the purpose of doing Vector Group Test?
why the NGR (neutral grounding resistor) always OFF during DG off?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)