Answer Posted / surender saini
PPM Schedule is prepared according to the activity code of the equipments
Because ppm is done on daily monthly & Quartley basis
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Why have to use copper cable for local isolator to motor ?
what are the safety measures of induction motor?
Hi,I am working in abroad for more than 3 years in a company operating with 11kv and 6.4 MW power. I need c licence in India,can I? some other says only i can get if i work for 2 years in india only! anybody kindly clarify by doubt.Thanks
how to extend relay operating timing in 24V dc relay card (without using Timer )
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
Why star delta starter is preferred with induction motor?
What is the method to solve circuit using source transformation?
Is there any specialised book to refer about fault level calculation both in MV and LV side??
before synchronizing an alternator,power factor is leading ,why?
what is the requirement regarding earthing of Single conductor with AWA
How to calculate the sag on transmission Lines.
For R-L or R-C ckt,time constant formula is L/R and RC respectively and its unit is in sec.Pls tell me the derivation
hi friends i m from electrical branch and seeking for tech. + apti. both papers of hpcl plz get it available as soon as possible
define the non synchoronism of synchoronous machine in general g or m??
DEFINE BREAKING CAPACITY OF BUSBAR & HOW IT IS CALCULATED?