Answer Posted / surender saini
PPM Schedule is prepared according to the activity code of the equipments
Because ppm is done on daily monthly & Quartley basis
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
why Current is lead 90 degree and voltage is lag 90 degree in a capacitor.? why Current is lag 90 degree and voltage is lead 90 degree in an inductor.?
What is the effect of positive feedback on stability of the system?
what are the things that can cause a three phase motor to crawl?
Do closed loops systems require manual input?
How the annunciator works ? How to do its wiring
what is the circulate the diesel in DG in side pls tell parts name and picture with circulate the diesel
What is the criteria for selecting the voltage classes of an AC Induction Motor.The KW rating above/below which ht/lt selection is made may be provided in details.
what could be the RMS value and average value of a 4 phase sine wave?
What types of question are done for diploma students in aptitude test
Why syn. Generators are used for the production of electricity?
Why do we require transformer with less specific weight if supply frequency is increased?
Is it possible to download the Siemens Selection Chart(TYPE 2 coordination) for 1) fuseless selection 2)Fuse selection
What is the effect of atmospheric pressure & Temp; on efficiency of motor? Why NGR(Neutral Grounding Resistor) is used in 132/11 KV Transformer & how? What is the use of Auto T/F in Grid Station?
In case of salient pole alternator when number of poles are 4 or more than 4 it helps the flux wave to be sinusoid as air gap length is increased from center to tip , but if the number of poles are 2 how does the flux wave is sinusoidal?
trasnfarmaer core make