17. What is the thing that can disappoint you while working
for a certain employer?
Answers were Sorted based on User's Feedback
Answer / indresh
No Clear Goals, KRA.
No support from Manager for self developement.
No clarity on scope of work.
| Is This Answer Correct ? | 11 Yes | 0 No |
Answer / guest
Having one of the team players repeatedly breaking
deadlines.
| Is This Answer Correct ? | 10 Yes | 2 No |
Answer / rashid khan,bptp ltd
dissatisfaction regarding professional growth
| Is This Answer Correct ? | 1 Yes | 0 No |
what is SPLICES & where it is used?????????????
difference between nominal mix and design mix difference between nominal size and actual size of brick,aggregate etc
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
how to calculate bearing capacity of soil
6 Answers L&T, Reliance, Sujala Infrastructure, TATA,
Define What is the force exerted by the Tacoma narrows bridge?
What is absolute pressure? How absolute pressure is calculated?
What is the volume of sand in per cubic meter if we have a design mix of concrete is 1:2:4 (by volume).
Wats the purpose of lap length? Is it for strength or increasing of span
Approximate weight of a modular brick?
What year was the keystone power plant in Indiana County constructed?
Concrete could be defined as, (1)An artificial stone (2)Structural stone (3)Strong stone (4)Rock and Sand stone
How can calculate cement quantity in brick work
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)