17. What is the thing that can disappoint you while working
for a certain employer?

Answer Posted / indresh

No Clear Goals, KRA.
No support from Manager for self developement.
No clarity on scope of work.

Is This Answer Correct ?    11 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?

2030


How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel

1385


How can i display 5 asterisk and another 5 asterisk )?

2076


What is a bearing capacity of soil?

811


how do you stabilize a waterlogged area in road construction

6303






within an emergency scenario what are the safe systems of work a coss can setup as part of is duties

1577


how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6

5789


How many square meter can mason layout chb per hour

1805


Use of coping on terrace wall and in 4" wall is compulsory or not ?

1098


Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa

1748


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

2500


How to calculate material and labor required for 100 m2 plaster?

1242


How much time Required for PPR pipe network testing

1691


what is the procedure of wet seiving. n percentage of silt in different type of soil?

2169


why top layer of block work shoud be full size if any cut block adjustable than another layer?

1671