Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why in india readymade structure is impossible in residence
houses?

Answers were Sorted based on User's Feedback



why in india readymade structure is impossible in residence houses?..

Answer / sudhir sinha

there are following resns frthis
1-it requires greater technical skill to erect ready made
house at various site.
2-it is not a permanent soloution of housing for their
occupants.
3- it is not cost effective and not comfortable.

Is This Answer Correct ?    4 Yes 4 No

why in india readymade structure is impossible in residence houses?..

Answer / savithri devi

To maintain houses our climate is not suitable for longer period

Is This Answer Correct ?    0 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

how much to get of BRC lapping in full yield and half yield ?

0 Answers   Engtex,


In beams why the depth is > width

3 Answers   L&T,


size of the traditional brick is 248*121*71 in mm,but why the size are like this.why the size are not like that 211*154*75 in mm

1 Answers   Merlion,


What is the strength of 150x150mm cube compared to 300x300mm concrete cube?? Why?

4 Answers   JP Group,


why steel stirrups in column have more spacing at center and less spacing at both ends??

5 Answers  


Which is the IS code Using for Cement Sand Mortar

5 Answers   HPCL,


Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa

0 Answers  


is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?

0 Answers  


PL.tell me about civil engineering questions with answer

0 Answers   Construction, L&T,


why top layer of block work shoud be full size if any cut block adjustable than another layer?

0 Answers  


What us meant by DLP & liquidated damages in civil quantity surveying

1 Answers  


Why is the use of granular sub-base in concrete carriageways not preferred, explain?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)