What us meant by DLP & liquidated damages in civil quantity surveying
Answer / sreekumar
DLP MEANS :DEFECTS LIABILITY PERIOD (Certificate)"
Normally it will count from the completion of the project up to 365 days as per the FIDIC. In between these period, contractor need to rectify all the maintenance and other damages. after the DLP the Consultant will be provided the Defects Liability Certificate. Then the contract can submit the Final Statement to the consultant/client for getting there 5% retention money.
| Is This Answer Correct ? | 3 Yes | 1 No |
What will be current cost Rs. per Sq.Ft. of RCC slab for home construction in mumbai
How much lap length provided in compression and tension in bridges?
how calculate volume of bulb(rimmer) of pile
How to check Diameter of Np2 rcc pipe?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
what is P.C.C ?
which type of binding wire gauge using gulf countries
What is tha cross secional area of cover block
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
List out some of the checking’s, done at the completion of construction?
limit value of bulking of sand
Middle point of any slab is raised 10-12 mm during shuttering work because––
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)