What us meant by DLP & liquidated damages in civil quantity surveying
Answer / sreekumar
DLP MEANS :DEFECTS LIABILITY PERIOD (Certificate)"
Normally it will count from the completion of the project up to 365 days as per the FIDIC. In between these period, contractor need to rectify all the maintenance and other damages. after the DLP the Consultant will be provided the Defects Liability Certificate. Then the contract can submit the Final Statement to the consultant/client for getting there 5% retention money.
| Is This Answer Correct ? | 3 Yes | 1 No |
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
You have casted a column above your footing, and you found out it is off its location by 5cm. What would you Do?
What is PCO
How to calculate shuttering plate weight
Use of coping on terrace wall and in 4" wall is compulsory or not ?
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
16 Answers Reliance, Siddhi Constructions,
In pile foundation which kind of action are take place?
Can any one give me any link to download civil engineering code in free ?
What is hybrid foundation?
Maximum foundation pressure under PRCC box is 19 T/Sqm and net safe bearing capacity is 12.65. Is it safe? pl help me
What is a BBS?Find out the cutting length for a 600*600 foundation with 50 mm cover
can i get placement in 2nd or 3rd year in college..
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)