why in india readymade structure is impossible in residence
houses?
Answer Posted / sudhir sinha
there are following resns frthis
1-it requires greater technical skill to erect ready made
house at various site.
2-it is not a permanent soloution of housing for their
occupants.
3- it is not cost effective and not comfortable.
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
How to make tiles floor step by step procedure?
how to calculate MR 9(derivation)
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
Why is concrete cube test carried out?
.5Ast
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
Explain the Strength of brick?
how much percent are used 20mm,10mm?
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
What are the reasons for geotechnical site investigations in uganda?
brickwork labour rate per cum ?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.