Unit weight of brick? Sand? Aggregate? Steel? Cement? Water?
Answers were Sorted based on User's Feedback
Answer / vansh
Brick = 1900-2100kg/m3
Sand = 1600kg/m3
Cement = 1440kg/m3
Water = 997kg/m3
Aggregates = 1520-1680kg/m3
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / muhammad younas
Size of brick= L=9",W=4.5",H=3"
Weight of one brick=2.4489kg
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / nandu kumar
unit weight of cement -1440kg.
" " water. -1000kg
" " sand. -1667 to1750kg
unit wait of steel. -7850kg
" " bricks. -1750kg
" "aggrigate -1440to1550kg
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / aabid
Brick - 19KN/m3
Stone - 25KN/ m3
Cement - 14.4KN/ m3
Sand . - 14.5KN/m3
Aggregate - 15.5KN/ m3
Water . - 9.81KN/ m3
Water . - 1000liter/ m3
Steel - 78.5KN/ m3
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / sanjaya kumar das
Brick :-1600 - 1900 kg/m3
Sand:-1450 - 1500 kg/m3
Aggregate :- 1450 - 1550 kg/m3
Steel:- 7850 kg/m3
Cement :- 1440 kg/m3
Water:- 981 kg/m3
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / arun brooks
brick - 1600kg/m3
cement - 1440kg/m3
steel - 7850kg/m3
water - 981kg/m3
aggregate - 1450 to 1550kg/m3
sand - 1450 to 1500kg/m3
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / brijesh kumar shrivastava
BRICK WORK-1900Kg/m3
CEMENT-1470 Kg/m3
STEEL-7850Kg/m3
WATER-981 Kg/m3
AGGREGATE-1450-1720 Kg/m3
SAND-1450-1620Kg/m3
Is This Answer Correct ? | 8 Yes | 10 No |
Answer / s.sheikabdullah
brick=1900kg/m3
sand(dry)=1700kg/m3,(wet)sand=1900kg/m3
aggregate=2000kg/m3
steel=7850kg/m3
cement=1440kg/m3
water=981kg/m3
Is This Answer Correct ? | 1 Yes | 3 No |
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
advantages & disadvantages of using crusher dust instead of sand in r.c.c work
3 Answers L&T, Shm Consultants,
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
What is binding spacing of the rebars at lapping zones.
difference between trapezoidal and pedestal footing and how the load acts on that
0 Answers Golden Construction,
how will i find leakage in underground?
1)pile is of 200mm dia.-- a)tell the cutting length of ring considering 2cm cover b) tell the quantity of concrete considering pile length as 3m c) tell concrete quantity in bulb
What is different type of bills?
Calculation of Pier Cap with tapper area?
why construction joint in the slab should be l/3 of span? what's the technical reason for that?
what is the quantity of concrete required in 1 cubic meter volume without reinforcement
in plate load test what is the thickness of plate 20mm 5mm 50mm none