We have a 33/11kv switchyard having 12.5 MVA power
transformer. We export & import power through this
transformer. When we export power, the PF will be depend on
GRID PF & when we import power the PF will be depend on our
load PF. but the problem is that,when neither we export nor
import but our 33KV vCB is in close position,our meter read
the power factor 0.14 to 0.25 at that moment. So how can be
we improve the power factor at that moment.

Answers were Sorted based on User's Feedback



We have a 33/11kv switchyard having 12.5 MVA power transformer. We export & import power throu..

Answer / k.prakashchandra

You should realise that when there is no load on
transformer, the pf is almost zero

Is This Answer Correct ?    2 Yes 1 No

We have a 33/11kv switchyard having 12.5 MVA power transformer. We export & import power throu..

Answer / vinova

try to put some light load on your transformer during this
period if you you wnt to keep the pf high during this
period. it happens because under no load condition the
power fector angle is near 75 and power fector is high. it
happens because tansformer need reactive power for
energising its magnatic circuit. as the outer load is zero
during no load the internal load of transformer is
inductive.

Is This Answer Correct ?    2 Yes 1 No

We have a 33/11kv switchyard having 12.5 MVA power transformer. We export & import power throu..

Answer / ab. khalil khan

are load variation in your plant? If variation for some minutes are in your plant then this problem should be created. In load time power factor was normal but on no load time power factor was abnormal, because we have maintain the power factor in on load position.At no load time capacitive power has make a leading power factor.for detail pl. cont. to Ab. Khalil 9977278622

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what is a pilot wiring and whys that called a pilot wiers

0 Answers  


how to calculate the multiplication factor in HT incomer trivector meters

9 Answers   Dalkia, Getco, Gujarat Energy Transmission Corporation Limited GETCO,


how convert kvar to microfarade? circuit diagram of infrared transmiter and receiver? circuit diagram of Fm transmiter and receiver?

2 Answers  


why always electric field is linked with magnetic field???

2 Answers   Bhushan Power Steel, NTPC, Tata Steel Limited,


Why ACB is used in LT why not in HT and why VCB is used in HT why not in LT

1 Answers   GE,






How can we get electric power from lighting ?

3 Answers   TATA,


what is work of CTPT in 33/11kv Substation

1 Answers   Fiat,


how can I check HT cable ?

2 Answers  


what is meant by directional earth fault and non directional earth fault? describe both.

0 Answers  


A MACHINE WHICH HAVE 1000rpm SPEED IS LARGER IN SIZE AS COMPARED TO THAT OF A MACHINE WHICH HAVE 1500rpm.WHY ?

2 Answers  


What’s electric traction?

0 Answers  


what is hormonics. how it is generated & what are the problem faced by that.

5 Answers   APC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)