can u please mail me the syllabus for GET exam for damodar
valley corporation?
No Answer is Posted For this Question
Be the First to Post Answer
What meant by lagging and leading? When if they are occurred what preventive methods should be taken?
14 Answers ABB, L&T,
why does the magnetic balance tests at transformers? how to provide earthing in flight?
HOW DO YOU CAN CHECK A 15KV DIODE, WHETHER IT IS OK OR NOT?
Why ct secondary is not kept open while primary charged. Answer in terms of ct parameters.
What is meant by H.R.C fuse?
40 Answers Gas Projects, GSCE, Taj Group,
Why indicated only R.Y.B to phase.
what is the meaning write of AC1,AC2,AC3 .....power contactor
If we need4× 50mm sq cable but it's not available so we can pull 4×25mm sq 2cables
HOW THE OLTC TRANSFORMER SAVE ENERGY IN COMPARISON TO OFF LINE TRANSFORMER AND IS IT ECONOMICAL TO REPLACE THE OFF LINE TRANSFORMER TO OLTC TRANSFORMER
how we can measure the dc current instead of clamp meter ?
what is the max. acceptable leakage current in 33kv bus bar
What is the difference between ACB & MCCB?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)