when a primary current injection test is required, it is
accomplished by what?
Answers were Sorted based on User's Feedback
Answer / mohammad farman khan-abu dhabi
Primary current injection test require at time of
commissioning to distrubution switchgear.High pot theory.
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / brijesh
Primary current injection test require at the time of
commissioning to the current transformer.
The purpose of it is to check the ratio of C.T.
and for checking of C.T. circuit.
The test is conduct by means of primary injection test set.
In test set there is a current transformer and variac.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / arvind negi
Primary current injection test require at circuit
protection equipment throw.
Is This Answer Correct ? | 0 Yes | 2 No |
How to Calculate KA Rating of Main LT Panel
if the transformer at full load have a iron loss =900w and copper loss = 1600w . what percent of the load will the transformer has a maximum efficiency?
how nautral is provided for return path is 3 phase induction motor
how we could know that generator running anti clockwise with seeing the rotating direction of prime mover or engine
what is subtransient , transient and steady stateac components
what is smart grid? why we use it? explain in detals bcoz i want give presentatin from it....
What is MPCB, MCCB, ELCB, RCCB ? Explain them ?
Why underground cables are used to connect transformers?In addition how are they again connected to lines after step up or step down?
What is Goerges phenomina to start SYCHNOUSMOTOR?
What is the maximum and minimum rating of UPS?
how induction motor work as a generator?
why would the rotor rotate at sub synchronous speed against the direction of rotating flux when d rotor of 3 phase IM is connected to 3 phase balanced supply and the stator windings are shortcircuited ??