when a primary current injection test is required, it is
accomplished by what?
Answer Posted / brijesh
Primary current injection test require at the time of
commissioning to the current transformer.
The purpose of it is to check the ratio of C.T.
and for checking of C.T. circuit.
The test is conduct by means of primary injection test set.
In test set there is a current transformer and variac.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How does a tertiary winding filter harmonic(espcially 3rd one) from entering into load system?
i m in need of current rating chart of heavy duty pvc/xlpe, cu/al cables. can somebody provide me? if yes, plz send me at ashish_patel111@yahoo.com
for what purpose the star point is done in ct
How to calculate the current of Highpressure Mercury Vapour Lamp?what is the basis?whether we have to consider power factor or not?
what do you mean by plant earthing system.
Define filter?
why does the magnetic balance tests at transformer?
Testing report of Earthing of 3.15 MVa PTR.
What must be the minimum distance maintained between 2 Generators as per International standards?
why 5kW motor becomes unbalance if its relay trip 1st time and its set value is 7.0 A
What is mean by Sensitive Earth fault & what are the effects
how to calculate current and voltage in a same circuit?
Why do we perform an open-circuit test and short-circuit test on the transformer?
what a function diesel generetaor turbo charger & turbo charger is more heated explain reason ?
how can I calculate charging current of cable/overhead conductor? what is roll of voltage in it ?