when a primary current injection test is required, it is
accomplished by what?
Answer Posted / brijesh
Primary current injection test require at the time of
commissioning to the current transformer.
The purpose of it is to check the ratio of C.T.
and for checking of C.T. circuit.
The test is conduct by means of primary injection test set.
In test set there is a current transformer and variac.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
dg earth connect only in the amf panel or not why
how to calculate earth fault relay current and CBCT ratio
Where can i get practical knowledge of solar system?
where the lexical paramater will use in fron end?
How u can give the overload setting to any motor protection relay for a HT motors with formula and Example?
there is an alternator 480 k.w, 400v,50hz, 4-wire running on load having leakage alternator body earthed current 38 A. is it within acceptable limit? if yes then give reference if no then how to bring within specified limit
What is sensitivity of a measurement?
what is the setting of locked rotor in HT motor ? (answer expecting in percentage)
Explain about c.t?
what is the generator rating for 40 amp load of 3phase motor.?? 400v voltage of generator... plz tell me with formula its urgent...plzzz... and also tell me that this 40 amp at all phases mean 40 amp on red,40 amp on yellow,40 amp on blue...... or the total sum of that 3phase is 40 amp....
What are the advantages of a three-phase system over a single-phase system?
iam working in power plant. In hot places tube lights are glowing at the end portion only. what is the reason for that?
What Is Connection APFC Panel In Compony.
In what cases (circumstances)we should apply P controller, PD controller, PI controller & PID controller ?
which is chemical used as in ro water what is difference betweeen multi grade filter&dual media filter