sir iam dng my engg final yr (civil) iam intrested to write
group_1 .if we write this exam what kind of jobs we get and
what should be the minimum score for us to get qualified
and iam having reservation too.
No Answer is Posted For this Question
Be the First to Post Answer
what is difference between long column and short column?
16 Answers L&T, Tomi Polytechnic,
Time required for curing of wall tiles before fixing
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
What is the standard unit of bricks???
what is the bearing capacity of hard rock
What is soil enforcement?
What is Gabion Walls?
What is thumb rule in quality and quantity estimation of a Residential building??
0 Answers Ascent Constructions,
what is the tool used at construction site for measuring cement, sand and blue metal in india.
how much time will take for G+22 building for completion? activity wise like excavation,sub structure,superstructure,finishing,handover?
In concrete mix, water is required . we tried in case of water we are used milk. what hapened
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)