what is the cost difference of a same structure when it is
constructed with brick masonary and when it is constructed
with block masonary and concrete as a frame
structure????????????????????????
No Answer is Posted For this Question
Be the First to Post Answer
you are planning to paint a newly fabricated workshop building made of structural steel of 10 tons total mass.you are require to paint 1 cot of primer and 2 coats of top coat.How many liters of primer and top coat you will request
Insted of water is there any liquid to mix in concrete / in mortar ?
suppose we have a tendency to make a hole on the surface of the beam, than where we goes to make it?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
The Instrument used to determine colour of water is called A] Turbidimeter B] osmoscope C] Barometer
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
Why joints are provided?
what is the proportion of M25 geade cincrete.?
form work including the props can be removed from beams only after
what is mixing ratio of M25?
How do you determine specific gravity of cement?
why shear reinforcement is not provided in the design of footing?