one litre of shuttering oil how much area covered the shuttering?..

Answer / bhabani bairagi

20 sqm

Is This Answer Correct ?    18 Yes 1 No

one litre of shuttering oil how much area covered the shuttering?..

Answer / krishna

1 liter will gives 4.2square meters.

Is This Answer Correct ?    5 Yes 2 No

one litre of shuttering oil how much area covered the shuttering?..

Answer / mashx69

Check this site for complete shuttering material req.

http://civilatwork.blogspot.in/2013/07/calculations-of-shuttering-material.html

Is This Answer Correct ?    0 Yes 0 No

one litre of shuttering oil how much area covered the shuttering?..

Answer / mashx69

1 litre shuttering oil =90sqft (Approx)
90sqft= 8.36sqm
therefore 1 lt Shuttring oil = 8.36sqm

Is This Answer Correct ?    0 Yes 1 No

one litre of shuttering oil how much area covered the shuttering?..

Answer / prashanth

For 1 sft=40ml;1sqmt=430.4ml
1lit=2.32sqmt

Is This Answer Correct ?    6 Yes 8 No

Post New Answer

More Civil Engineering Interview Questions

how u design STAGING for Superstructure in BRIDGE construction?

0 Answers  


how to calculate upthrust pressure of under ground water tank in wet soil?

1 Answers   NSL,


IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI

0 Answers  


what is a pretension and post tension with an example

1 Answers  


Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?

0 Answers  






sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience

0 Answers   L&T, Rail Vikas Nigam Limited RVNL, RRB,


how to do connection between steel beam (I-Section) with R.C.C column??

2 Answers  


what is rolling margin of steel

1 Answers   Tata Projects,


Insted of water is there any liquid to mix in concrete / in mortar ?

2 Answers  


What is IS code stirrups

1 Answers   MES,


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

0 Answers  


what is the diffrence between grade beam and plinth beam

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)