Answer / sjtbehera
beam test is carried out for checking shear strength,
flexural strength, load capacity
Is This Answer Correct ? | 6 Yes | 0 No |
Answer / mks
actually bekelmen beam test is carry out for surface
eveness of pavements.
Is This Answer Correct ? | 2 Yes | 0 No |
concrete beam test is carried out for the find of flexural
stess or modulus of rupture
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / nilmoni das
Beam test is carried out for the load which comes from building i.e dead load,live load ,wind load,
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / utpal ray
Beam test is done. To know shear strength ,tensile strength
Is This Answer Correct ? | 0 Yes | 0 No |
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
how calculate volume of bulb(rimmer) of pile
In case of columns the cover is from main steel or from stirrup & which is the IS code mentioned in it?
How to calculate the sand and aggregate in concrete
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
Where are laterally loaded piles are used in practice?
Differentiate first angle & third angle projection?
please help me to find a mix design ratio for M40....
How and where from do we get 162 for calculating sectional weight of TMT
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
how calculate bench mark errors