Beam test is carried out for?

Answers were Sorted based on User's Feedback



Beam test is carried out for?..

Answer / dharmendra

flexural strength

Is This Answer Correct ?    8 Yes 0 No

Beam test is carried out for?..

Answer / sjtbehera

beam test is carried out for checking shear strength,
flexural strength, load capacity

Is This Answer Correct ?    6 Yes 0 No

Beam test is carried out for?..

Answer / shashi

beam test is carried out for checking shear strength,
flexural strength, load capacity

Is This Answer Correct ?    4 Yes 0 No

Beam test is carried out for?..

Answer / mks

actually bekelmen beam test is carry out for surface
eveness of pavements.

Is This Answer Correct ?    2 Yes 0 No

Beam test is carried out for?..

Answer / k chiranjeevulu

concrete beam test is carried out for the find of flexural
stess or modulus of rupture

Is This Answer Correct ?    2 Yes 0 No

Beam test is carried out for?..

Answer / hanish sehgal

building strength

Is This Answer Correct ?    4 Yes 4 No

Beam test is carried out for?..

Answer / nilmoni das

Beam test is carried out for the load which comes from building i.e dead load,live load ,wind load,

Is This Answer Correct ?    0 Yes 0 No

Beam test is carried out for?..

Answer / utpal ray

Beam test is done. To know shear strength ,tensile strength

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

In barbending schedule why is o.42*D is taken. Means why o.42 only???

1 Answers  


What is gauge and gage

2 Answers  


what is water cement ratio m10,m15,m20,m25,m30,m35,m40

1 Answers   Quaid-e-Azam International Hospital,


the bubble tube parallel to the telescope of theodolite should be more sensitive since it controls a. vertical axis b. horizontal axis c. axis of bubble tube d. none of this

4 Answers  


What is Gabion Walls?

1 Answers   Rajhans Infracon,


What goals do you have in your career?

1 Answers   Zadran Group,


Define What materials were used to build the Golden Gate Bridge?

1 Answers  


I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.

1 Answers  


time and work questions

0 Answers  


a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer

1 Answers  


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

0 Answers   NTPC,


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)