In barbending schedule why is o.42*D is taken. Means why o.42 only???
Answer / arghya das
that is 1.42d-d=0.42d
(1.42d comes from 1/sin45) 45 degree crank bar.
| Is This Answer Correct ? | 4 Yes | 0 No |
Can anyone tell me the thumb rule for calculating structural steel quantity?
what is workability,define it?
what is anchorage? Why anchoring of reinforcing bars necessary and what are the shapes ?
for 1sft of Cement plastering ratio 1:3 How much quantity of cement and sand required.?
2 Answers CGL, URC Construction,
how to find no bar in 1 length
How many solid blocks can build one mason per 8 hours?
wht is off shore structure
200mm*200mm thick block work 1sqm how many cement bags
In case if concrete box girder bridges how is the number of cells determined?
How steel required for 823 sqm of flooring work in 150mm c/c in single jali?
how to calculate the quantity of steel used for construction..
how many cubic centimeter in one unit of sand?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)