In barbending schedule why is o.42*D is taken. Means why o.42 only???
Answer / arghya das
that is 1.42d-d=0.42d
(1.42d comes from 1/sin45) 45 degree crank bar.
| Is This Answer Correct ? | 4 Yes | 0 No |
can you provide a link for manual design of building?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
how much binding wire is required for one tone steel
20 Answers Gammon, Hinduja, Jindal,
how we calculate the grade of the Bituminous materials.?????
Are you interested in starting a fly ash brick making unit?
what is the least count of Total station
Reinforcement details at hinged joint
for 1cum how much bag of cement is used for M20 grade
what are the different types of sizes of bricks?
Which is default or standard size of tiles used in dado bathroom
point of contraflaxure
Plese tell me about cranked beam (end hook lenth, crank angle, crank length). Thanks.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)