the bubble tube parallel to the telescope of theodolite
should be more sensitive since it controls
a. vertical axis
b. horizontal axis
c. axis of bubble tube
d. none of this

Answers were Sorted based on User's Feedback



the bubble tube parallel to the telescope of theodolite should be more sensitive since it controls ..

Answer / bhanwar

Horizontal axis

Is This Answer Correct ?    67 Yes 3 No

the bubble tube parallel to the telescope of theodolite should be more sensitive since it controls ..

Answer / saurav gupta

B horizontal axis

Is This Answer Correct ?    6 Yes 0 No

the bubble tube parallel to the telescope of theodolite should be more sensitive since it controls ..

Answer / mohamed hussain

Option C ,axis of bubble tube

Is This Answer Correct ?    7 Yes 18 No

the bubble tube parallel to the telescope of theodolite should be more sensitive since it controls ..

Answer / mukesh

C axis of bubble tube

Is This Answer Correct ?    4 Yes 22 No

Post New Answer

More Civil Engineering Interview Questions

Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.

0 Answers   College School Exams Tests,


what is local scouring?

2 Answers  


How much bricks in 1sq.meter with thickness 9inch.

3 Answers  


Please i want to know how to find column main bar cat of length

0 Answers  


Can any colleague send me the steel frame pictures of roofs, beams, columns, footings, roof bends, door bends etc. I shall be very gratefull.Suhail_akhter@hotmail.com

0 Answers  






how much quantity of blocks, cement and sand is required to complete 1sq.m of CC Hollow blockwork. Size-16"x8"x8". Also what is the cement sand ration commonly used?

10 Answers   ACC, CCCL, L&T, MFAR, Shoba Devlopers, SLS Developers,


what is quick sand

4 Answers  


6. What would your co-workers say about you?

0 Answers  


Define Who designed the city of Washington DC?

0 Answers  


3. What are the disadvantages of your present job, things you do not like about it?

0 Answers  


what is the cement mortor thickness for 23 cm brick work and 11.5 brickwork?

5 Answers   Punj Lloyd Ltd,


Heat gain in buildings is best resisted by

6 Answers   AIEEE, B Arch, JMC Projects, Unique Dream Builders,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)