Answer Posted / hanish sehgal
building strength
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
wat would be the probable interview questions and GD topics for IOCL exam?
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
What is the quantity of cement in mix m20 concrete?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
How you can turn off the display for dimension in CAD?
How to find out slope footing concrete
Which is the best book for building construction?
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
Define What is Civil Engineering?
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)