why we are used D.c. voltage in L.T.side or controling
side.we can use UPS also ,in place d.c. voltage
Answers were Sorted based on User's Feedback
Answer / gangadhar shailaja bellary
Your question is not perfect.Any way UPS not suply the the
DC voltage is suply a/c only with out interupt.We use DC in
control circuit because it has free from hormonics and it
has constant.
| Is This Answer Correct ? | 15 Yes | 0 No |
Answer / dinesh kumar sharma
dc voltage is necessary for l.t pannels was because dc is
free from harmonics as well as smooth, in dc voltage no
variations are there so controlling becomes easier.
no we can not use ups takes ac to charge battery store in
dc and than when ever supply cut off than battery going to
discharge voltage is converted into dc to ac one of the
example in case of computer
and also ups can be used for smaller duration so why we
use UPS
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / mashani
UPS is not DC it's AC....this equipment usually to support
Control system such as Computer Sentral Control....this
equipment is supplied by battery which the battery is DC
source.....and convert by inverter inside UPS to AC source
to supply the emergency equipment...
emergency equipmen is equipment where may not interrupt
even the main source is blackout....
if you mean DC source this could be battery
charger....battery charger ussualy used to operating
controoler....such as PLC, also some electrical equipment
is needed DC source...such as Circuit breaker, ACB(Air
Circuit Breaker) motor inside the breaker is using DC source
| Is This Answer Correct ? | 0 Yes | 4 No |
what is purpose of using reactor in substations.
20 Answers Heavy Engineering Corporation Ltd HECL,
errection check list for transformer maintenance
Draw the circuit of clapp oscillator?
on 22.03.2015 at 17:15hrs Y phase 66kV class Power Trf-2 Current transformer has flashed over and oil came out. The failed CT has been replaced on 24.03.2015 at 13:15hrs and the Trf has been charged in presence of RT Hassan after conducting the pre-commissioning tests. On the same day at 17:00hrs the commissioned CT has again flashed over and immediately the Trf has been isolated from power supply. It is confirmed the secondary is not opened and checked the earth integrity and is found ok. Here what would be the reason for the CT failure?
What is meant by rating error prevention in breaker??
What is ac and dc drive.
we can conformed the vector group of the transformer. How?
HOW TO CALCULATE THE HEAT AND LOAD OF LT-SUBSTATION WHICH CONTAINS 2*1MVA TRANSFORMERS,LT SWITCH BOARD,MLDB,ACB,BUSBAR,ETC...?
why field winding in synchronous machine connecting in star position?
why odd hormonics only will effect the power system.why not even hormonics
Can I use less voltage cable for neutral, since the voltage of return path is zero ideally?
HAI,HOW TO SET THERMAL OVERLOAD RELAY FOR DOL STATRTER FEEDER AT START AND RUNNING?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)