why we are used D.c. voltage in L.T.side or controling
side.we can use UPS also ,in place d.c. voltage
Answer Posted / mashani
UPS is not DC it's AC....this equipment usually to support
Control system such as Computer Sentral Control....this
equipment is supplied by battery which the battery is DC
source.....and convert by inverter inside UPS to AC source
to supply the emergency equipment...
emergency equipmen is equipment where may not interrupt
even the main source is blackout....
if you mean DC source this could be battery
charger....battery charger ussualy used to operating
controoler....such as PLC, also some electrical equipment
is needed DC source...such as Circuit breaker, ACB(Air
Circuit Breaker) motor inside the breaker is using DC source
Is This Answer Correct ? | 0 Yes | 4 No |
Post New Answer View All Answers
what is meant by vector group of a transformer? How can it be derived?
boiler is running in rankine cycle and deisel generator is....?
What does the kvar means?
What are the basic & Majour problems in UPS ?
How PADO software increase the efficiency of power plant?
What is the current carrying capacity of 35sq.mm flexible cable?
What determines the thickness of the lamination or stamping?
why actual valve timing diagram is different than ideal valve timing digram of a 4 stroke engine?
Explain The Application Of Storage Batteries?
During Testing of Maintenance Free Earthing, How deep should be the Spikes of Earth Test Meter should be inserted in the soil(one spike is 15 Meter & Other spike is 30 Mtrs away from the Main Earth Electrode. Because, recently, we observed that when spike is inserted 3-4 Inch in the earth- results are better, If spike is inserted 1 feet deep than results are increasing.
Generation of voltage for each phase are same of a turbogenerator.Although the short circuit current flow when two phase of turbogenerator are shorted(where current can't flow without potential difference),why?
In diesel generator how AVR get voltage to excitation. And basic diagram DG EXCITATION CIRCUIT.
what is mean by restructuring power system?
how to calculate power consumption in slip ring motor at different step
what is the practical application of full adder circuit?