first wt is reqd. for making a mix design of concrete & the
procedure of determining the qty. of material used in
concrete.



first wt is reqd. for making a mix design of concrete & the procedure of determining the qty. ..

Answer / nravindran

1.Find the Exposer condition
2.Find the grade of concrete
3.What is the minimum cement content
4.What is the maximum water cement ratio
5.Take the standard deviation
6.Find the specific garvity of bulk materials
7.If Admixture required what kind of admixture required
8.Finally adopt the formula

V=[W+C/Sc+1/PxFa/SFa]x1/1000 This is for calculate Fine
aggregate content

V=[W+C/Sc+1/1-PxCa/Sca]x1/1000 This is for calculate Coarse
aggregate

For further details pl refer IS 10262,456

Is This Answer Correct ?    4 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

neutral axis more than the critical neutral axis then rainforcement in rcc beam belong to over or under rainforcement

2 Answers  


Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?

0 Answers   L&T,


convert 1 guntha = how many wars or 1 war = how many gunthas

5 Answers   Shaw,


How will find compresive strenth of M20,M25,M30 after 7day,8day 28day etc please drive step by step not shot?

2 Answers  


In jack arch floor, the rise is kept?

0 Answers  






Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.

16 Answers   Reliance, Siddhi Constructions,


if the length and breath of footing is 1.2m x 1.2 m what will be the length and breath of foundation trench

5 Answers  


WHAT IS DIFFERANCE BEWTWEEN NP2 AND NP3 OF RCC HUME PIPE?

2 Answers  


parts of stair-case?

3 Answers  


if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.

0 Answers  


what is the standard gradient or slope for drainage?

1 Answers   IGC, SPL,


What is the difference between NP2 and NP3 Class RCC Hume Pipes

5 Answers   Honest Derivatives Pvt. Ltd, Indian Hume Pipe Co, M2K,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)