Which IS Code describe the industrial flooring?
Answers were Sorted based on User's Feedback
Answer / vinay
The industrial buildings are usually one-story structures
but some industrial building may consist of two or more
storey. Reinforced concrete or steel-concrete composites
slabs are used as a floor system. The rolled steel joists
or trusses or plate girders support these slabs. The design
of reinforced concrete slabs shall be done as per IS 456-
2000.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / jsg
Industrial floor is high grade Vacuum de watered concrete
floor.topping with Ironiting on the top surface finished
with Power trowel.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / m i khan
IS 13026:1991 Specification for bitumen mastic
IS 15193:2002 Code of practice for laying of pitch-mastic
flooring
| Is This Answer Correct ? | 0 Yes | 0 No |
how to convert cement, sand aggregate quantity from M3 to kg with full description?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
very simple or less time consuming formula for reinforcement calculation by moment
how many BSCs can i connect to the HUAWEI MSC
what is the defination of an ideal fluid?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
why compression strenth of concrete is tested with a cube of size 150x150x150 mm ?
How do you calculate qty for form work like props shuttering sheet and acro span for residential block ? for Example: 10 sq mt what is the material and qty require to do form work.
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
1.How much strength will be attained for M30 grade of concrete after 28 days? 2.Is it attain 30 N/mm2 or target mean strength?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)