Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


which software better design in structure design or Rcc
design(STAAD PRO,TEKLA STRUCTURE)

Answers were Sorted based on User's Feedback



which software better design in structure design or Rcc design(STAAD PRO,TEKLA STRUCTURE)..

Answer / shujath

hello Shamsul, can u send me this ESTEEM software

And I want to know about it more.

shujathishaq@gmail.com

Is This Answer Correct ?    0 Yes 0 No

which software better design in structure design or Rcc design(STAAD PRO,TEKLA STRUCTURE)..

Answer / siddarth

pl.send me the detail about the esteem software.if u have
this software ,pl. send to my mail
siddarthreddy.006@gmail.com

Is This Answer Correct ?    0 Yes 0 No

which software better design in structure design or Rcc design(STAAD PRO,TEKLA STRUCTURE)..

Answer / jagadeesan

pl.send me the detail about the esteem software.if u have
this software ,pl. send to my mail jagadesh
email:jagadesh.desh@gmail.com

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

what do u mean by elongation & flakiness of aggregate?

5 Answers  


how many bag of cement needed for concreting 14.93 m3 at the ratio of 1:4:6 and 1:5:6

1 Answers  


how do we calculate quantity of gypsum for 1m3? 1m3 = ?kg

2 Answers  


i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???

0 Answers   QRI,


what is mean by bond strength?

1 Answers  


What is the meaning of unit weight of cement?

2 Answers   L&T,


What is the mixing of D.P.C?

3 Answers  


What is meant by solid geometry?

0 Answers  


How many required steel of 1m3 slab casting?

3 Answers  


how to absorb to site basic corrections? which are the important correction?

0 Answers  


How much ratio of water in use of 1m.cube r.c.c the ratio is (1:2:4)

4 Answers   Azmeel, HMN, NCC,


How to activate isometric axes in cad?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)