WHAT IS DIFFERANCE BEWTWEEN NP2 AND NP3 OF RCC HUME PIPE?
Answers were Sorted based on User's Feedback
Answer / sjtbehera
As per IS458-1988
NP2 is RCC hume pipe for light weight traffic
NP3 is rcc hume pipe for medium duty traffic
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / mkg
np2 pipe withstand 4kg/cm2 pressure
np3 pipe 6kg/cm2
| Is This Answer Correct ? | 0 Yes | 0 No |
how many types of foundation
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
can any1 mail me IS CODES and quality check sheet of materials..? its urgent plz
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
what is the advantage and disadvantage of using stone dust as a fine aggregate in concrete?????????
how calculate volume of bulb(rimmer) of pile
1)define the critical items in rcc framed G+18 bldg. as Cr Activity 1,Cr Activity 2,Cr Activity 3...etc. 2)on what logic is MSP and Primavera planning based.FS SF FF...
What are the benefits of rcc pipes over steel designed pipes?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
Mix proportions of m30,m35,m40
how to caliculate required amount of cement and sand required for 1cu.m.
How many times one TMT bars bents & straight upto not broken the bar.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)