stadard dimention 19cm,9cm,9cm
nominal dimention 20cm,10cm,10cm
in nominal brick concrect size around the brick
considred.............but standard brick is concrect free
brick
| Is This Answer Correct ? | 17 Yes | 2 No |
Answer / rishi chauhan
std brick-190*90*90 mm
nom brick-200*100*100 mm
| Is This Answer Correct ? | 16 Yes | 1 No |
Answer / rizwan khurram
19cm*9cm*9cm > standard
20cm*10cm*10cm > Nominal
Nominal is the c/c distance between the brick with mortar
| Is This Answer Correct ? | 17 Yes | 2 No |
Answer / kartik khanna
standard size :- 19*9*9 cm
nominal size:- 20*10*10 cm
but in prcticality it is 23*11.5*7.6cm......this is wat our
external examiner told us in our practical.....if any one
interested in discussing such questions mail
me .....kakukhanna@gmail.com
| Is This Answer Correct ? | 23 Yes | 9 No |
Answer / mounika
standard size 19x9x9cm
nominal size 20x10x10cm
| Is This Answer Correct ? | 19 Yes | 5 No |
Answer / ramesh
standard size :- 19*9*9 cm
nominal size:- 20*10*10 cm
but in practically it is present used in works is 9"x6"x4"
and 9"x4"x3"sizes bricks are used
| Is This Answer Correct ? | 16 Yes | 2 No |
Answer / shalender kumar
stantard size of modular is 190*90*90
nominal size of modular is 200*100*100
standard size of fps brick 230*115*70
| Is This Answer Correct ? | 23 Yes | 9 No |
Answer / sohail akhtar
standard size of brick as per Indian standard is 19*9*9 cm
Nominal size is 20*10*10 cm
Nominal size includes the thickness of mortar so it's bigger than standard size
| Is This Answer Correct ? | 19 Yes | 5 No |
I need to know the productivity of meason/labour/barbender/carpenter while doing work like Shuttering, reinforcement steel, brick work, earth work?
what is the cutting length for circular ring???please clarify.
12 Answers ACC, ATS, KCC,
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
0 Answers GKC Projects Limited GKCPL,
A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
sir how can we find the cement and sand required for making 4" drop
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
The foundations are placed below ground level, to increase?
how much cement and sand required for 1cum rr masonry
What is the quantity of steel, cement, sand, and aggregate required for a 2100 sq ft Roof Slab(Residential Building) area of RCC?
component parts of a weir
4 Answers Infosys, L&T, Zamil Steel,
Mix proportions of m30,m35,m40
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)