WHAT YOU MEAN BY PROOF STRESS?
Answers were Sorted based on User's Feedback
when a material such as Aluminium doesn't have an obvious
yield point and yet undergoes large strain after the
proportional limit is exceeded an arbitrary yield stress may
be determined by Offset method .A line parallel to initial
part is drawn which is offset by some standard amount of
strain such as 0.2 % ,the inersection of the offset point
defines the yield stress which is slightly above the
proportional limit and is called 'PROOF STRESS'.
| Is This Answer Correct ? | 67 Yes | 11 No |
Answer / p. elango
Many alloys do not show either a definite elastic limit or
yield point. Because of the importance of the yield point
to designers, calculations have been developed to produce
an artificial approximation. This approximation is known
as ‘proof stress’ and relates to a pre-determined amount of
permanent deformation measured against the strain axis.
A line parallel to the initial gradient of the stress strain
diagram is drawn. Where the drawn line and the curve
intersect is the proof stress . Proof stress is
most often calculated around the values of 0.1% and 0.2%
of the gauge length.
| Is This Answer Correct ? | 8 Yes | 1 No |
Answer / venkatraman
when draw 0.2% parallal line to stress- strain curve from the
orgin in x direction(strain) it will meet in curve at a point
that point is yield point corresponding stress value is proof
stress
| Is This Answer Correct ? | 8 Yes | 9 No |
how much cost of single coat 20mm thick plastering per sqre meter
Design a rectangular channel.
0 Answers CSI, Engineers India Limited,
What is the difference between stress and pressure
what is the tensile strength of 10swg and 8swg gabion wire?
Number of cement bags required for concreting 1000 square Feet slab of 4 inch thickness.
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
HOW TO CALCULATE THE CEMENT & SAND REQUIRED FOR 1SQM BLOCKWORK OF 200MM THICK?
Can a 9" x 24" RCC beam be supported on 18" x 18" RCC beam.
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
what are the standard & nominal size of brick
FOR concrete structure curing is important for hydration process,curing component is good for the concrete if W/C ratio is more than .38
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)