why the power cut problems occur in tamil nadu?
may i know the exact reason.plz
Answers were Sorted based on User's Feedback
Answer / anu priya
hai i'm anu..there is no awarness of consuming electricity
in our state..& there is no suitable engineers to overcome
this problem
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / j.p.n
main reason is : one man getting profit, tamilnadu people
getting suffer....... we have essential power in tamilnadu
no one reallise... daily 300 tones of coal we given in
north m.p and u.p.....at this time (still) any other
district suffer at 9 to 12 hours power cut daily? no...
basically we are having madness people.......thats is main
reason...... all are suddenly forgotten all te thing.....
tamilnadu did not getting electricity and its going to
touch water.... its beforely one person tell at 1992 period
itself.....no one understand......i think we are going to
seperate?
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / niceguy
I think the discussions are nowhere related what is being
asked. It will be better if ppl could focus on the root
cause for implementing this rolling blackouts and the
measures being taken by the TN Government along with what
are the individuals' responsibilities to turn this around!!
Note: This message is not intended to offend anyone but to
focus on finding a solution!
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sundar sampath
If the consumption of power increases, you need to increase generation of the power. But power cut is not the solution i think. Why is there no Solar power plants in TN? Why don't TNEB employees suggest this idea to GOVT for implementing? The employees will have to give the idea. GOVT can only spend money for the idea given.
@@TNEB Employees : Please suggest plan like this instead of announcing powercuts?
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / dinakaran
Implementing Solar Power Projects in war footing will have Renewable Energies Utilised and When NO SUNLIGHT, fossil fuels can be used to generate power!!
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sanjana
The power shortage in tamilnadu..because poor monsoon know so production rate were much less..tn governmeent planned to implement hydalpower energy from upcoming weeks...they are bottlenck to get energy from north side....
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / republic of gamer
The reason behind this act was no attention over the EB employees.And the government taking care of supplying the electricity to high paying factories and companies.
Second reason is distribution sense is not up to literate person level.(where no need of power,good supply is there).
Finally, Destroying resources may give this like questions and me give answers.....Better Save the mother nature.
| Is This Answer Correct ? | 0 Yes | 0 No |
WHAT IS M.P.C.B
In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.
how to determine Sq.mm size of finolex power cables.
Explain what is use of lockout relay in ht voltage?
what is the instataneous value of voltage in a 3-phase balanced star connected circuit?
checking procedure of capacitor based motors.used in fans etc?
in communication what is the role of elelctrical engineer?
whats relation b/w motor current & friqency
A wattmeter is marked 15 A/30A, 300V/600V and its scale is marked up to 4500 watt. When the meter is connected for 30A, 1600V, the pointer indicates 2000 watts. The actual power in the circuit in
what the function breaker failure scheme, how is it operated
which relay is better , instantaneous or IDMT relay .
Dear Friends, Need your help for connecting APFC panel, Quotation : I have 2 No’s 1000 KVA Transformers, both transformers are having separate APFC panels, ( Tr-1,400KVAR, TR-2,450 KVAR) Now I want to stop One transformer, present load is 650Amps, Max, So One transformer is enough, I have switched OFF TR-1, but PF is not maintaining properly, its 0.5, So now I want to connect TR-2 APFC also in TR-1 Loads, Can any one answer for my Quotation with drawing, how to connect TR-2 APFC panel in TR-1 Loads,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)