if one potential missing in energy meter , how much % slow
the energy meter?



if one potential missing in energy meter , how much % slow the energy meter?..

Answer / raul

If the potential coil is missing then the meter reading
will not advance i.e. the meter reading will stop
incrementing as the rotation of the energy meter disc is
dependent upon the interaction of fluxes created by the
shunt and series magnet with each other's induced current.
And when the flux created by the potential coil is absent
then the deflecting torque would be zero and hence the
rotating disc will not rotate.

Is This Answer Correct ?    4 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

How can calculate HT side VCB? For example I have 1250 KVA load what will be HT side VCB Amp.range and what size XLPE cable I use for HT side.

2 Answers   NASSA, Orchid, SB Automation,


A wattmeter is marked 15 A/30A, 300V/600V and its scale is marked up to 4500 watt. When the meter is connected for 30A, 1600V, the pointer indicates 2000 watts. The actual power in the circuit in

1 Answers   Jindal,


Why we are designed only 11Kv and 6.6Kv Alternators, not 33Kv Alternators and Power Transmission side we are designed only 220kv, 120kv, 66kv, 33kv, 11kv, and 440volts, not 20kv, 50kv, 100kv.

2 Answers  


Three phase alternators are connected in star connection why?

13 Answers   Tanfac,


What are the parameters of water ( Water quality )to be monitored in Centralised HVAC ( water cooler chillers )

0 Answers   Ambuja,






why name plate detail HP/KW rating of a motor is different from measured value HP/KW using formula?

1 Answers   MAHINDRA,


In an ideal transformer no load primary current I0 A lags behind V1 by 90 degree B is in the phase with V1 C leads V1 by 90 degree D lags V1 by 45 degree

1 Answers  


CONSIDER A 415V/200V STEP DOWN TRANSFORMER.CAN WE USE USE IT AS STEP UP TRANSFORMER BY GIVING 200V IN SECONDARY AND TAKING OUTPUT FROM PRIMARY?

22 Answers   L&T,


What is ahu ? Working principal.

0 Answers   Sodexo,


hi this toufik here. i am doing my b.e.degree.now i am in final year and supposed to do a project in this year so i thinking to control the buchholz relay using software base means checking the status of transformer oil using microcontroler, plc or scada. so can i do so...??? alz suggest me...

2 Answers  


What is the meaning of floating point earthing in battery backed systems ?

0 Answers  


I need the proper answer on :- What is the Earthing Value as per the standard for Raw power and UPS Pit and in panel /DB N-E value ???

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)