testing of transformer
Answer / binod
THE FOLLOWING TEST ARE THE MINIMUM REQUIRED BEFORE CHARGING
A TR.
1)short cicuit test
2)opencircuit test
3)insulation test
4)magnetic core blance test
5)tan delta test
6)transformer oilo B.D.Vtest
7)silicagel color test
8)w/t&o/t functioning test
9)buchhols contact operation test
10)prv working test
Is This Answer Correct ? | 6 Yes | 0 No |
why zero sequence impedance measurement is not applicable for single phase GT
in transmission line 11kv is step up or step down? why?
Terminal blocks is used for segregate the connections... There is any principle for terminal block..?
Which Motor used in Fan's Motor ?
3 Answers Matsui Technologies,
If load is 240 kw & pf is 0.8 lagging, than how to increase it from0.8 to 1.0(unit),which rating capacitor used, please give me Calculation. What is effact of consumer & suplier if pf is lagging or leading with on effect machines/ TF/GE etc.
WHAT IS MEANT BY SHEATH VOLTAGE IN 132Kv cable?
what is the actual difference betwen constructional details and constructional features?
Which is remain unchanged in transformer action?
why we don't use air circuit breaker on H T line in place of vacuum circuit breaker ?
where induction generator is used ?
the need of star to delta anddelta to star
I have 11KV/415V power distribution transformer. I have found unbalance current in LT (415V) side. Also observed that unbalance voltage (3V) at LV side due to HV side unbalance voltage. What should I check for this? Also, the same LV side load can run in balance on captive power.