Hi I'm doing my MBA(3rd semester).I applied for the post of
ET conducted by BHEL the last year.I cleared the written
and lost in personal interview.Again I wrote the exam this
time and cleared the written n yet to take the personal
interview.Shall I disclose in the interview about my
studies.What shall i say if they ask about my change from
studies to job
No Answer is Posted For this Question
Be the First to Post Answer
what is the use of earthing ?
why we use taping of transformer on HT side?
i HP = ?? 746 watts or 735.5 and how??
why Induction Generators are not "Black start" ? and apart from WTGs where this types of generator are generally used?
in shunt clippers why a resistor is used in sereis with the input
How much inductance or resistance require as a starter in series with induction motor of specific capacity(e.g. 5 hp) ? What is formula for it ?
What is the meaning of GRID?
what is reactive power?, why its measured in VA ? is it transient behavior of system?
WHAT IS PRINCIPLE OF TRANSFORMER
why we are having many type of vector group in the transformer ,what is the use of it?
How to check the efficiency of the generator , air compressors.
what meaning of gd squre
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)