Two electronic energy meters are connected to seperate
phase wires, but connected to a looped neutral. Are these
going to function correctly?
Answer Posted / raj varpe
yes as the required input is provided to both energy meters
they will work satisfactorily but they are not usable to
measure 3-phase power correctely
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what are the parameters plays a major role in Potential transformer Burden calculation??
HOW MUCH CURRENT DOES SYNCHRONOUS MOTOR TAKES AT SYNCHRONOUS SPEED IN NO LOAD CONDITION ?
how to find 5 kilo meter long under ground 33 kv cable fault location if IR VALUE shows 0.05 M ohm @5000 volt.and cable fault locator shows some time fault distance 3 kilo meter ,3.7 kilo meter and some time 1 kilo meter? now how to find the fault location that where is leakage. note--it is tested with 5000 kv megger and insulation resistance is 0.05 M ohm. and some time 0.03 M ohm comes.
by using pump duty, how we will can calculate the motor duty(KW)? is there any standard or formula.
how can we say that stator magnetic field rotates with synchronous speed?can we derive?
what type of questions are asked and howmwny questions belong this catagory?
Explain what is electric traction?
what is the relation between reactive power and power factor for the what is the limit of reactive power and power factor
What do you mean by distribution transformers?
What is the two pole structure?
which type of stability limit is higher,steady state or transient? why?
Dear all i am kumaravel. now in chennai. my work is control and relay panel auto cad designing.up to 11kv to 400kv then question is i am improving my knowledge. i want some books name and auther are available for this C&R panel related. plese any one help me
Explain thin film resistors and wire-wound resistors
when the Transmission and Distribution network where is the "feeder" lines are located? and why should be used in T&D network.....
I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.