Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Why we do design mix of concrete when there is nominal
method using the IS-Code available ?

Answers were Sorted based on User's Feedback



Why we do design mix of concrete when there is nominal method using the IS-Code available ?..

Answer / rakesh kumar mallik

In case of making prestressed concrete high strength
concrete is required to reduce the dead weight of
structure,shrinkage and creep of concrete,that can be
possible only by the use of design mix concrete rather than
nominal mix of concrete

Is This Answer Correct ?    0 Yes 0 No

Why we do design mix of concrete when there is nominal method using the IS-Code available ?..

Answer / elanthendral m.

Proportions for Nominal Mix-Concrete:
Nominal mix concrete may be used for concrete of M 20 or
lower. The proportions of materials for nominal mix
concrete shall be in accordance with table no 9 (IS 456-
2000)

above M20 grade we have to go for mix design produces as
per IS 10262-2009.

all the batching should be veigh batching only

Is This Answer Correct ?    0 Yes 0 No

Why we do design mix of concrete when there is nominal method using the IS-Code available ?..

Answer / er. salim nagori

As per IS 456-2000
The nominal mix proportion is restricted upto M25.

So in order to achieve beyond M25, we follows mix design
calculation i.e: Design Mix

Moreover the design mix can be done for any mix
M5, M10, M15, ....... M60,and so on as per development in
technology.

Is This Answer Correct ?    0 Yes 2 No

Why we do design mix of concrete when there is nominal method using the IS-Code available ?..

Answer / neeraj

in nominal mix we consider only cement,agregate & water in
volumetric method and can achieve upto 25mpa crushing
strength .We also get big range in strength of same mix
whereas design mix we accuratetely implement reduction of
water cement ratio by use of plasicisers ,account for
desired temparature & achive strength upto 100mpa or more

Is This Answer Correct ?    1 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

what are the types of roads?what are the types of highway?

2 Answers   NG Project,


What is the result of cube in 7 days test ?

3 Answers   Casa Grande, Heer Enterprises, Him Shikhar Construction,


how to convert kg/m3 to cu ft

1 Answers   Ace Group,


Can inverted beams used in pipes during construction?

0 Answers  


How much quantity a carpenter can do in a day

1 Answers  


y we need to take 28 days strength as compressive strength ? y cant we take 30 th day

2 Answers  


where can i get the previous question papers for rrb section enginerr (civil)

0 Answers   RRB,


How to calculate the sand and aggregate in concrete

1 Answers   DLF, OMC,


How calculate the physical stock of material such as Fine/Coarse aggregate,sand & stone dust laying at site?

3 Answers  


How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm

0 Answers  


why the openings of sieves are square io size?

0 Answers  


What is Rankine Cycle?

0 Answers   Bechtel,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)