Why camber is provided?
Answers were Sorted based on User's Feedback
what is coping?
11 Answers GKC Projects Limited GKCPL, Technical Construction, Vijai Electricals,
1 liter emulsion paint covered how much area?
17 Answers Asian Alliance Insurance, Aspirtek, DEWA, L&T,
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
# 1. size of the Bricks # 2. Minimum Crushing Strength of Bricks
what mean By core Billing
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
what is water cement ratio m10,m15,m20,m25,m30,m35,m40
1 Answers Quaid-e-Azam International Hospital,
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
2. What are the grades of steel used in the concrete design?
what is steel
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
what is a mix design GSB and WMM
5 Answers Maharashtra Industrial Development Corporation MIDC,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)