Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How can calculate ups battery back up time?

Answers were Sorted based on User's Feedback



How can calculate ups battery back up time?..

Answer / g.shanmugam

Battery back up time=Battery current at full load/Battery Ah

Is This Answer Correct ?    308 Yes 161 No

How can calculate ups battery back up time?..

Answer / guest



As a thump rule,if we need 1 hrs backup from the 1 KVA UPS
12V/130AH is Required,For Example,10 KVA ON-Line
UPS,Battery-12V/65AH,26 nos.

BAck-up Time=Ah of the Battery*Total no of the
Battery/Output KVA*130
BAck-up Time=65*26/10*130
BAck-up Time=1.3
BAck-up Time=60~70 Mins(Approx)

Is This Answer Correct ?    219 Yes 147 No

How can calculate ups battery back up time?..

Answer / r.gopalakrishnan

SEE SUPPOSE IF I NEED 740 WATTS USAGE BACK UP TIME UP TO 3
HOURS, THAN I CAN CALCULATE LIKE THIS(EXAMPLE 1
PC@350WATTS,3 FANS@80X3=240WATTS& 3TUBE LIGHTS
@(40+10CHOKE)=50=150WATTS)TOTAL=740 WATTS REQUIRE,= 740
DIVIDED BY 12 V=(61.666667)>61 Ah per hourx3
ours=183Ahbattery,(180Ah Battery).now you have selected
battery & than select a UPS/inverter that is you can only
get 80% of your UPS/inverter.Ex;1000 watts Ups/inverter.that
will be always safe for you & ever.thanks.R.GOPALAKRISHNAN.

Is This Answer Correct ?    96 Yes 40 No

How can calculate ups battery back up time?..

Answer / sss

UPS Backup=Battery Voltage*Battery Ah/Load (watt)

Is This Answer Correct ?    98 Yes 47 No

How can calculate ups battery back up time?..

Answer / subir kumar manna

UPS BACKUP TIME= NO OF BATTERY X AH OF BATTERY /OUTPUT KVA
X130

Is This Answer Correct ?    66 Yes 41 No

How can calculate ups battery back up time?..

Answer / parameshwara.s

Tell me on a 5 KVA UPS with 12 Batteries of 65 AH how many
hours of backup will I have on full load.

Is This Answer Correct ?    36 Yes 11 No

How can calculate ups battery back up time?..

Answer / n.muthukumar

ups backup time=battery AH*battery efficiency*no.of
batteries/ups capacity in kva*130*output power factor

for example:65*0.9*10/5*130*0.8=1.125

approximately:1hr 15min

Is This Answer Correct ?    39 Yes 21 No

How can calculate ups battery back up time?..

Answer / claudiu

You can calculate the max time to use a UPS with this
formula

T max = efectiv energi / average power of the energy

that min

T max = 1377 (this is a constant, it's so big because it's
calculate in seconds)* capacity of batery in volts 12V *
capacity of batery in amper's 10Ah or other valu * number
of moduls (number of bateris to use) / how mutch power you
want to consum in W

for exemple

I have 8 baterys with 12V and 10Ah and I want to standup a
computer with 300 W consum

so
1377*8*10*12/300 = 4406.4 seconds that min 4406.4/3600 =
1.2h

sorry for my english

best regards,
Claudiu from ROMANIA

The sours is
http://en.wikipedia.org/wiki/Uninterruptible_power_supply

Is This Answer Correct ?    29 Yes 16 No

How can calculate ups battery back up time?..

Answer / asela

nomber of battery * battery voltage * each battery AHR
(130AHR total/ nomber of battery)130/260* efficiancy 90
PERCENT/ tatal VR.

26*12*5*0.9/1000
1 HR AND 4 MINUTES

Is This Answer Correct ?    38 Yes 27 No

How can calculate ups battery back up time?..

Answer / yogesh

UPS backup time= Ah of battery * no of battery/output kva * 130

Is This Answer Correct ?    73 Yes 68 No

Post New Answer

More Electrical Engineering Interview Questions

i have been tasked with a design of protection, metering and control(PMC) relay panel extension to accommodate all PMC relays.There is an already existing panel where this one will be built.What are the design aspects for this kind of project? thank you.

0 Answers  


Can you any one explain different between instantaneous over current and IDMT

1 Answers  


what is the tolerance for the magnetic balance test conducted on the distribution transformer?

0 Answers  


what is the IS foe lightning arrester?

0 Answers  


what is data block in plc ? How the values of data block are written and read by hmi ? what is the difference between function and function block ?

0 Answers  


why occ characteristics curve in not tracing back when we are bringing back the rhoestat?

0 Answers  


What is meant by transformer, why it should be used, with out that equipment what happens if we transformed the supply?

12 Answers   Bhel,


what is the contact resistance of vacume circuit breaker??

1 Answers  


please send me RRB electrical engineer previous year questions for Sr. Section Engineer

0 Answers  


we have two motors 1250kW,6.6kV to be coupled on the same shaft ,so please provide assistance for their synchronisation.

0 Answers  


considering the 3phase and single phase ac system the load applied and the volage given is same...will the current differs for both the cases are it wil remain same?

5 Answers  


in our transmisison sub station why we step down firstly 132kv\33kv then 33kv to 11kv. can we direct step down 132kv to 11kv.

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)