Answer / ashok kumar

in DC motor speed control is very easy and for kiln
operation it required high starting torque , so we go for
dc motor but at the present scenerio we go for Ac motor
because initial cost of dc motor is very high and its
maintenance cost is also high.

Is This Answer Correct ?    34 Yes 2 No

Why in DC drive u r using in Klin operation in Cement Plant?..

Answer / saravanan

its because of High torque. but now a days AC motor is also
applicable for Kiln Drives

Is This Answer Correct ?    27 Yes 8 No

Why in DC drive u r using in Klin operation in Cement Plant?..

Answer / deepak gade

Hi

Kiln need high starting torque,and DC motor have capability
to produce high torque for kiln rotation

Also dc drive have speed accuracy, we can increse/decrese
speed upto 0.1 v dc

Is This Answer Correct ?    16 Yes 0 No

Why in DC drive u r using in Klin operation in Cement Plant?..

Answer / anam uddin

High Staring Torque & Speed Accuracy place an important role in kiln operation & DC drive can deliver both almost precisely so DC drive is preferred over others.

Is This Answer Correct ?    0 Yes 0 No

Why in DC drive u r using in Klin operation in Cement Plant?..

Answer / yaseen

dc drive is used for the following reasons
1 we need high torque.
2.we require speed.
3.ac can be used ,but there r some problems(due to high
cost)
4.cost of ac is more as rms is continues.

Is This Answer Correct ?    7 Yes 9 No

Why in DC drive u r using in Klin operation in Cement Plant?..

Answer / malikarjuna

due to constant troque and speed will same 10%+-

Is This Answer Correct ?    4 Yes 6 No

Why in DC drive u r using in Klin operation in Cement Plant?..

Answer / waqar hussain

in cement industry no modification required & Cost no matter in cement industry it also very

Is This Answer Correct ?    0 Yes 5 No

Post New Answer

More Electrical Engineering Interview Questions

EXPLAIN WHAT BTU STANDS FOR(AIRCONS)

2 Answers  


Is it good to short Neutral and Ground in the PLC or DCS main Power supply. Pls give YES or NO with reasons...? Simarpreet

0 Answers   Bindal Papers,


i have 400/230v transformer and didnt done the neutral eatrhing. i connected one lamp to one phase and neutral to the earth. but the lamp is not glowing. again i connected neutral to earth and repeated the same. then the lamp is glowing. in the first condition i tested with a line tester also, at that time the tesrer is glowing what is happening i dont know can any one help me?

1 Answers  


How does flights get the neutral(grounding)

1 Answers  


What is referred to the electron in the outer orbit?

0 Answers  






My system is 22kv/3.3kv transformer. client is asking to use NGR, but as we have dedicated Neutral Earthing systems which has a value less than 1 Ohm. So i want solid comparision. Why i should not use NGR as my system is already protected.Can any one help me to get out of this.how should i reply on basis of some great comparision and calculations. Please help

2 Answers   Ariel,


Show Details FROM:Muhammed Ikram TO:qa@allinterview.com Message flagged Saturday, June 4, 2011 10:07 PMMessage bodyHello all, i want to ask a question to all of you that what is VMM (voltage monitoring module )? how it work,s? i heard somewhere that it compare 1 phase voltage to other phase voltage. but there is also some setting on it. how to set it,s setting. please tell me briefly. Thank,s and Regard,s. Muhammed Ikram.

0 Answers  


what are the safety measures of induction motor?

0 Answers  


we are going to install a solar PV site and how can we calculate PV Solar Panel Efficiency, can anybody tell me complete method for its calculation.

0 Answers  


In radial network the source is fed from 1 end both ends at central

0 Answers  


Double Busbar Scheme for outdoor switch yard system (132kv) step up power plant Hi friends 1. in this system both busbars energized all the time. 2. what is the meaning of main BB and transfer BB, 3. step up transformer connect main bus bar all the time or both BB connected through DS switch . 4.bus sectionalization means ? thank you.

1 Answers   ABC, Gael,


3 shows a 415 V, 3-phase generator supplying a 3-phase 415/110 V transformer. Draw the individual and combined impedance diagrams to a base of 10 kVA. Determine the system fault kVA and the fault currents at the 415 V and 110 V busbars for short circuit faults on the transformer input or output terminals. Work in p.u. values of impedances.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)