Why in DC drive u r using in Klin operation in Cement Plant?
Answer Posted / ashok kumar
in DC motor speed control is very easy and for kiln
operation it required high starting torque , so we go for
dc motor but at the present scenerio we go for Ac motor
because initial cost of dc motor is very high and its
maintenance cost is also high.
| Is This Answer Correct ? | 34 Yes | 2 No |
Post New Answer View All Answers
IN electrical field, WHAT ALL THINGS THE CUSTOMER WILL ASK WHILE ORDERING FOR LT PANEL (ALL TYPES OF LOW TENSION PANEL)
What is miller crystal oscillator? Explain its operation?
Explain about how is it working Earth fault'relay and wahts the resistance value of earth bed
What are the functions of different probes used in cro?
Which power will flow first if we switch on a motor Active or Reactive? How?
Instrument connected to a single phase supply
WHAT IS SUBSTATION & ACCORDING TO VOLTAGE HT,EHT SUBSTATION EXPLAIN IT
IF TVM OF TRANSFORMER SHOWS POWER FACTOR ON 33 KV SIDE AS 0.97 LAGGING AND ON 132 KV SIDE IS 0.75 LEADING.IS THIS CORRECT.WHERE IS PROBLEM.
what is the effect of power factor of machines in starting current
Explain the process of commutation in a dc machine.
what are pilot cells
How to size Air Circuit breaker (ACB)? What is the most important factors?
What size cable (based on voltage drop) is required to supply a 40 A three phase boiler if the wiring system is 75V single insulated cables installed in non-metallic rigid conduit 56m from the main switchboard? Voltage drop in the consumer's mains is 8V.
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
what is transformor oil gread