How do we check transformer losses and what are the ways to
minimise it.

Answers were Sorted based on User's Feedback



How do we check transformer losses and what are the ways to minimise it...

Answer / guest

transformer losses can be found by doing open circuit test
and short circuit test
open circuit test gives the core losses
short circuit test gives the copper losses
note in open circuit test the lv side is given supply and
in short circuit test the hv side is given supply

the iron losses can be reduced by providing laminations of
thinner dimension and using c.r.g.o sheet for laminations

the copper losses depend on the winding resistance which
increases due to heat can be reduced by providing
sufficient cooling to the winding.

Is This Answer Correct ?    36 Yes 2 No

How do we check transformer losses and what are the ways to minimise it...

Answer / manthesh.patil

we can check transformer losses by short ckt and open ckt test
,for checking cu loss we use short ckt test and for iron
loss we use open ckt test..to reduce copper loss we should
go for good cooling and for iron loss the core should be
perfectly laminated

Is This Answer Correct ?    26 Yes 4 No

How do we check transformer losses and what are the ways to minimise it...

Answer / sumitgarg

we can check a trans losses by open circuit and short
sircuit test.
to minimise these losses we shuold have a good cooling
system. apart from that all other points are related with
the insulation of the core,permitivity etc.

Is This Answer Correct ?    27 Yes 10 No

How do we check transformer losses and what are the ways to minimise it...

Answer / achala.g.s.

We can check like the following :
polarity, resistance and tap change operation tests should me made to check whether it has built correctly or not..


the ways to minimize it are:
*check of Oil quality.
*A check on the tap changer.

Is This Answer Correct ?    3 Yes 1 No

How do we check transformer losses and what are the ways to minimise it...

Answer / saravanan

oc and sc test helps to find the total losses means .oc test
gives the core loss .sc test gives the copper loss.if the
transformer is oil cooled means you must check the
conduction or breakdown test on the transformer oil. that
time only we can suggest the winding insulation loss

Is This Answer Correct ?    2 Yes 7 No

Post New Answer

More Electrical Engineering Interview Questions

what is CRGO Transformers?

6 Answers   MSETCL Maharashtra State Electricity Transmission Co Ltd, TATA,


During Load testing of battery charger with temporary AC Generator .When reach 70% load Generator immediately shutdown .we could not able to Recognize ,what is exactly problem .Please kindly clarify us

1 Answers  


Why do we will ground the positive terminal in electrostatic precipitator

1 Answers   JSW,


Hello, I am just preparing my self for a university interview and struck on the 11kv ring main unit system network. I just know that ring main unit has total three breakers, fuses and use to supply a power to any load/ building without any interrupt. But i am not be able to visualize the connections, either Ring main unit getting power from two different power sources? or there is always one feeder in complete ring circuit??? I would be highly thanks full of you help me.

1 Answers  


why auto transformer connected in star?

1 Answers  


Which is remain unchanged in transformer action?

6 Answers   NTPC,


A 400KVA ,50HZ TRANSFORMER IS TO BE OPERATED AT 50HZ.THEN KVA RATING OF THE TRANSFORMER?.

4 Answers   GATE,


KVAR Kilovolt-Ampere-Reactance

2 Answers  


DIFFERNCE BETWEEN DCS AND PLC? HOW IT WORKS?

0 Answers   Essar,


what would the resistance of a 110v 150w submersiblepump motor windings be

1 Answers  


21. What is the purpose of taking Capacitance and Tan Delta Test in Transformer bushing? 22. What are the protections to be used for Generator? 23. Draw the vector diagram and condition for the following: 1) Dyn1 2) Ynd0 3) YnYn0 24. What happens when the polarity changes in CT? Explain briefly? 25. Explain the Term in CT Name Plate – Class: 5P10

3 Answers  


Why and which type of tertiary winding is used in most of the power transformer?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)