what are IS code for
M20, 25, etc
Answers were Sorted based on User's Feedback
Answer / gopal chandra sahu
refer the IS 456-2000 FOR M-20, M-25,M-30 ETC
Is This Answer Correct ? | 5 Yes | 1 No |
Answer / poonam mumbarkar
M2O,M25 is grade of concrete and IS code is standardise
refferance document of" Indian Standard" for MIX DESIGN
procedure,for testing,for workability,and achived target
strength(Normally IS codes For using
456,516,2386,4031,8112,and last one is 100262).
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / jaydeep banerjee
As per IS the volume mix of concrete shoud be mix for
M20,1:1.5:3 ratio and for M25-1:1:2 ratio and after 28
days compressive strength should be more than 20N/mm2 for
M20 & 25N/mm2 for M25
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / dayanidhi balabantaray
I think IS code 456-2000 & all so with IS code 10262
7 days compressive strength is above 67%
28 days compressive strength is Fck+4
Fck=characteristic strangth
for eg. characteristic strangth is 20 N/mm2 so 20+4=24N/mm2
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / poonam kadam
M2O,M25 is grade of concrete and IS code is standardise
refferance document of" Indian Standard" for MIX DESIGN
procedure,for testing,for workability,and achived target
strength(Normally IS codes For using
456,516,2386,4031,8112,and last one is 10262).
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / prakash
ITS CONCRETE DISENGAGE MIX AND IS CODE 456-2000 TELLING
MINIMUM OF CONCRETE GRADE
Is This Answer Correct ? | 0 Yes | 0 No |
at the beam-column junction point tell me how much beam bars should pass through column ring ? 3 or 2 or 1 . answer with reason. if it is not happen then what will be he effect ?
What is quantity of Cement and Sand required for the 1 cum brick masonry with 1:6 Ratio cement mortar.
2 Answers RPP Infra Projects, SIL,
in a building what is the thickness of a wall in metres? dafault wall value?
What is the ratio of materials used for M10, M15, M20 & M25 grades of concrete? Also specify the quantity of water used in each grade & how to calculate it?
19. Are you a team player?
Is there any change in IS code regarding location of laps for column reinforcement. Can we place staggered alls for column reinfr.at one floor lvl?
How can explode a block?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
how many quantity of water use in 1cu.m. concrete
what is mean by bPo in construction? pls tell me