Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what are IS code for
M20, 25, etc

Answers were Sorted based on User's Feedback



what are IS code for M20, 25, etc..

Answer / gopal chandra sahu

refer the IS 456-2000 FOR M-20, M-25,M-30 ETC

Is This Answer Correct ?    5 Yes 1 No

what are IS code for M20, 25, etc..

Answer / ajay kondapalli

IS 456-2000

Is This Answer Correct ?    3 Yes 1 No

what are IS code for M20, 25, etc..

Answer / poonam mumbarkar

M2O,M25 is grade of concrete and IS code is standardise
refferance document of" Indian Standard" for MIX DESIGN
procedure,for testing,for workability,and achived target
strength(Normally IS codes For using
456,516,2386,4031,8112,and last one is 100262).

Is This Answer Correct ?    1 Yes 0 No

what are IS code for M20, 25, etc..

Answer / rahul

get all the codes from www.iscodes.blogspot.com

Is This Answer Correct ?    1 Yes 0 No

what are IS code for M20, 25, etc..

Answer / krishna prasad

456, 10262, SP 23

Is This Answer Correct ?    1 Yes 0 No

what are IS code for M20, 25, etc..

Answer / jaydeep banerjee

As per IS the volume mix of concrete shoud be mix for
M20,1:1.5:3 ratio and for M25-1:1:2 ratio and after 28
days compressive strength should be more than 20N/mm2 for
M20 & 25N/mm2 for M25

Is This Answer Correct ?    1 Yes 1 No

what are IS code for M20, 25, etc..

Answer / chandra prakash shrivastava

IS 456 - 2000

Is This Answer Correct ?    0 Yes 0 No

what are IS code for M20, 25, etc..

Answer / dayanidhi balabantaray

I think IS code 456-2000 & all so with IS code 10262
7 days compressive strength is above 67%
28 days compressive strength is Fck+4
Fck=characteristic strangth
for eg. characteristic strangth is 20 N/mm2 so 20+4=24N/mm2

Is This Answer Correct ?    0 Yes 0 No

what are IS code for M20, 25, etc..

Answer / poonam kadam

M2O,M25 is grade of concrete and IS code is standardise
refferance document of" Indian Standard" for MIX DESIGN
procedure,for testing,for workability,and achived target
strength(Normally IS codes For using
456,516,2386,4031,8112,and last one is 10262).

Is This Answer Correct ?    0 Yes 0 No

what are IS code for M20, 25, etc..

Answer / prakash

ITS CONCRETE DISENGAGE MIX AND IS CODE 456-2000 TELLING
MINIMUM OF CONCRETE GRADE

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

How to construct a water sump in a rocky soil?

0 Answers  


what is kribs is supporting?

0 Answers  


what is project planning

2 Answers   NCC,


What is the roll of face bars in beams

2 Answers  


1 building project (work in progress) and following are sum detail about his project 1) Using local rebar grade 415 2) Total built up area- 60000 sq.ft 3) Floors to be constructed – 21 storey 4) Estimated requirement of Steel per sq. foot – 7KG/sq.ft 5) Concrete grade – M35 6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm for stirrups) Wanted to ask u if this person uses 500D…what are the benefits he will be getting? Whether his per Sq. foot consumption can b reduce? If yes den around how much?

1 Answers  


The horizontal distance between parallel main reinforcements in RC slab shall not be more than

1 Answers   BEL, BSL, L&T, Mrkr Constructions,


what is called Bulk Density of aggregate?

0 Answers   PBL,


What is the use of extruded feature in solidsworks?

0 Answers  


how much shuttering oil required for 100 sqm shuttering?

1 Answers   L&T, NCC,


What is the difference between simply supported beams and cantilever beams

2 Answers   Osmani Constructions,


Management diagram of your project is–––

1 Answers  


how to find the percentage for minimum reinforcements as per IS:456 for beam , column, slabs.??

1 Answers   Gammon,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)