Answer / ms
1800+80=1880
1880*10=18800
=18.8KL PER DAY FOR DRINKING & TOILET USE
| Is This Answer Correct ? | 13 Yes | 2 No |
Answer / rajababu
Per day we can use 20 lit. So,1800+80=1880. 1880×20=37600
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / vikas & k.k
Around 30000 liter per day it is for govt school consider it may used drinking, cooking & toilet
| Is This Answer Correct ? | 0 Yes | 2 No |
what is curtailment in rebars
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how can change 10mm dia @130c/c bar spacing to 8mm dia
What is mean by Engineers ?
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
any book or article on pumped concrete.
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
How to calculate cement qty of M10, m20, m25 ? I got the formula but I lost it.
What is the quantity of cement, sand, and gravel to be used in M20 grade of concrete for 1000 x 1000 x 1000 mm of sand (for cement please mention in kilos, and for sand and gravel please mention it in CFT)
how to caculate cutting lenght in bar bending schedule for 180 degree bend
for brickmasonry strengthwise which bond is better?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)