Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What do you mean by transformation ratio of instrument transformer?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Electrical Engineering Interview Questions

Define bibo stability.

0 Answers  


why are the transmission lines operated at 220 kv nly... nt les dan dat...

3 Answers  


What is the difference between AVR and Servo Stabliser

3 Answers   Wipro,


1.why should we connect the measuring instruments in l.v side in short circuit test of a transformer? 2.why the power factor is less in open circuit test of a transformer?

0 Answers  


What is the unit of magnetic flux density?

0 Answers  


what happen when power factor of 2 parallely operated transformer become equle?

0 Answers   Flextronics,


Dear Respected sir how to test ABB REX521 protection relay by relay tester.

0 Answers  


On what basis primary and secondary of a transformer is chosen?

2 Answers  


how rated the neutral voltage of transformer and reactor, e.g. 400/220, 200MVA transformer have neutral voltage of 33kv. and reactor voltage 145kv. how this rating decided?

1 Answers   MEIL,


Hello, im taking an introduction to PLC..and i'm having a hard time on creating a program for 2 lamps blinking alternately with this button characteristics: 1.) One push button (starts upon pressing) 2.) Same push button (when pressed again, will pause the system) 3.) Same push button (when pressed again, will continue the paused system) 4.) Same push button (when pressed within 2 seconds, will shut off the system) Pls..i know this is just a simple problem for you guys..

2 Answers  


what is electrostatic presipitator in thermal power plant,and why it is used?

2 Answers   ACC,


checking procedure of capacitor based motors.used in fans etc?

0 Answers   Badve,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)