What is hybrid foundation?
No Answer is Posted For this Question
Be the First to Post Answer
if the diameter of capillary tube is double then the capillary rise will be
General Knowledge 1. Which is the virus for SWINE Flu? Ans.H1N1 virus 2. Who is Paola Maino? a) Original Name of Sonia Gandhi. b) Mother Name of Sonia Gandhi c) An actress d) Christian Missionary 3. Who is Andy Moles? 4. Which state there is no scheduled caste seat for lok Sabha Assembly? CIVIL ENGINEERING 1. When was Indian road Congress (IRC) established? 2. What is the camber for Concrete Road? 3. What is the camber to be provided for Earth Road? 4. What is the ruling gradient to be provided for Plain roads? 5. What is the type of surveying to be used for deciding the alignment of hilly roads? 6. What is the condition on which Bernoulli law depends? 7. water is which type of fluid a)Newtonian b)Non- Newtonian c)Ideal d)Compressive 8. The law of continuity depends upon what factors? 9. In Plane Table surveying which is done first a) centering b)Leveling c)Orientation d)Centering and leveling simultaneously 10. Pavement width depends upon a)Type of terrain b) lane width c)Type of traffic 11. Which is costliest type of timber a) Sal b) Shish am c) Teak? 12. Which is timber used for making plywood a)Teak c) Bamboo fibers d)Common Timber 13. What is Veneering?
3. What are the disadvantages of your present job, things you do not like about it?
How to check the quality of cement?
what is velocity of approach?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
how much quantity of cement and sand required for construction of 10 cum brick work( Brick size 3"*4"*9"(Standard size ) an d for 10 cum construction of SSM (Size stone masonary) with Cm 1:6 for both.
11 Answers GRC, KEC, L&T, Techno Electric and Engineering, UPENN,
what are the diffrent kind of grades in concrete and what does M means while specifyng the grades?
How to compute minimum number of columns required for a site from area of site?
WHAT IS TEAM SIZE IN CONSTRUCTION WORK
what is difference in chemical composition between fe415 and fe500
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)