May I Get an E-mail ID or contact details of Mr. C.M.Dordi
Vice President - Technical Sales Ambuja Cements Limited.
Please
No Answer is Posted For this Question
Be the First to Post Answer
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
I'm constructing my house, now at lintel level. I need belt concrete with laft..length - 22ft, berth- 11ft, one side laft for 2ft, *22ft length. Kindly inform me centring cost only, without material cost.
1 what is the nature of your job? 2 what major product or service does your company offer? 3 hoiw does the knoledge of chemistry hels in your job?
What things architect have to take care of before starting any project?
what is bond strength .
what are the differences between Tie beam, Ground beam and strap beam. thanks
what is the compresive strength of m20 concrete at 7 day
How much is the cover for slab?
how the find the quantity of water used to make 1 cubic meter concrete mortor
What is 1/8 on the architect ruler denotes?
what should be the quantity of water in m20 cocnrete /per bag cement-- whats the formula
What is the difference in Cement content for M-20 Concrete if y ou use OPC & PPC? What is the difference in the Curing Period?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)